General topics
Sailing boats
Speedboats
Fishing boats
Cruisers
How to
Yachts

                                      
 BoatNames Blog
 

Spit Bridge additional openings for testing

Penny Robins, NSW Roads and Maritime

Posted: 9  Aug. 2012

Motorists and skippers are advised of changed traffic conditions on the Spit Bridge, Middle Harbour from 12 August for testing of the newly upgraded bridge span lift system.

Additional openings are scheduled for Sundays 12 and 19 August and Sunday 2 September between 11.30pm and 5am.

This means motorists, pedestrians and cyclists wishing to cross Spit Bridge could be delayed for up to 15 minutes during the testing on these dates.

If emergency vehicle access is required, testing will be postponed.

Electronic message signs will be in place at either end of the bridge to provide advanced warning of planned testing times.

Motorists are advised to plan their journey, allow extra travel time and obey all signs.

For traffic information contact the Transport Management Centre on 132 701, or visit
www.livetraffic.com

 
 
     



    Blog by Name for a Boat